Work Measurement Techniques: The Six Methods
Work measurement determines the time required to complete an operation, the basis of every production standard. Garment manufacturers use six techniques, each with trade-offs. Choosing the right one depends on volume, product stability, and how much accuracy you need.
The six techniques
| # | Technique | Accuracy | Best for |
|---|---|---|---|
| 1 | Time study | High | High-volume, repetitive (progressive bundle) |
| 2 | Judgment | Low (approximate) | Small firms, short runs, custom orders |
| 3 | Predetermined motion-time systems (PMTS) | Highest consistency | Setting standards before production |
| 4 | Standard data | High (firm-specific) | Repetitive operations with a firm's own database |
| 5 | Operator reporting | Low/unreliable | Small-volume custom work |
| 6 | Work sampling | Statistical | Non-repetitive operations |
Sign in to continue
Work Measurement Techniques: The Six Methods
Create a free SpecForm account or sign in to open the Production Knowledge library. Full articles and their data visuals are included with any SpecForm plan.